StealthBox AI

From business problem to governed local AI in production.

A controlled path, not a procurement risk. Nine stages take a StealthBox system from the operation it serves to the runtime it runs on — through discovery, requirements, workload assessment, architecture, hardware sizing, software configuration, integration, security design and validation — then deploy, train, hand over and support the lifecycle. Formal acceptance (FAT/SAT) is applied where the engagement calls for it.

The method

Nine stages. One accountable path.

Each stage has an executive intent and a technical action. Nothing ships until Assure passes; nothing is abandoned after Deploy — Operate owns the lifecycle.

01

Discover

Understand the operation before touching AI — what work exists, what hurts, what should stay local.

TechnicalProcess mapping, data and systems inventory, sensitivity classification, success criteria.

02

Design

Design the target state — which layers of the value chain the system owns, and how it stays governed.

TechnicalArchitecture, deployment model selection, control framework mapping, identity and boundary design.

03

Size

Size the runtime to the workload — not to a spec sheet.

TechnicalCompute, memory, storage and accelerator sizing; concurrency and latency targets; capacity plan.

04

Validate

Prove the design on a controlled pilot before committing.

TechnicalControlled pilot, representative workloads, evaluation against success criteria, risk register.

05

Build

Build the runtime, models, knowledge and agents as one governed system.

TechnicalRuntime configuration, model selection and evaluation, knowledge indexing, agent and policy build.

06

Integrate

Connect to the systems the operation already depends on.

TechnicalAPI and event integration, identity federation, data connectors, legacy bridges, synchronisation.

07

Assure

Assure before go-live — security, governance, audit and human approval all verified.

TechnicalSecurity review, policy and permission verification, audit and provenance checks, approval gates.

08

Deploy

Deploy to the environment it was sized for — on-prem, hybrid, air-gapped where supported, or sovereign cloud.

TechnicalStaged rollout, rollback plan, controlled connectivity, environment promotion, cutover.

09

Operate

Operate and evolve — models drift, knowledge ages, policies change.

TechnicalMonitoring, model and knowledge updates, patching, evaluation cycles, incident response, lifecycle support.

The loop

Assure gates the ship. Operate owns the rest.

Deploy is not the end. Models drift, knowledge ages and policies change — so Operate closes the loop back into Discover, and the system keeps earning the trust that Assure verified.

Start

Request an architecture session.

Tell us what needs to stay local, what needs to be governed, and what needs to work. We'll start at Discover.

Request Architecture Session